Multi-Storey Car Park, Feuchtwangen Casino, Germany
RUNDFLEX on FB 180 folding platforms and
KG 180 climbing brackets Circular walls economically climbed
The site was favourably placed for traffic, directly on the Feuchtwangen motorway junction. Two 300 mm thick walls of 4.00 m internal and 13.20 m external radius divide the double-lane entrance and exit ramps of the rotunda.
The wall surfaces were to be constructed in fair-face concrete, joints and ties designed to suit the building.
According to the plans of the Planning Department of the contractor the site climbed the 12.50 m high external shell with RUNDFLEX on FB 180 folding platforms in 3.90 m high lifts. The platforms were suspended on anchors concreted into the previous lift.
Altogether 39 MULTIPROP slab tables made up the slab formwork for the 12% sloping roadways. The erection of the tables on site was made without complications, supported by PERI assembly instructions.