PERI Systems In Use

TRIO Column formwork

Using the TRIO column system the various column sizes throughout this project were formed without difficulty.

Scottsdale Waterfront Residences, Scottsdale, AZ

For this project, PERI Formwork Systems supplied over 65,000 ft² (6,000 m²) of SKYDECK slab formwork system.
Over 2,500 SKYDECK panels were used to form the main slab areas.

Medical Research Facility, Edinburgh University, United Kingdom

When completed in July 2005 the new 4 storey Medical Research Centre building for Edinburgh University will be linked into the new Edinburgh Royal Infirmary.
Housing Complex, Bratislava, Slovakia

Housing Complex, Bratislava, Slovakia

The structure of this housing complex was designed with flat slabs but without beams.
Kuhn Drain GWK Drainage Project, Detroit, MI

Kuhn Drain GWK Drainage Project, Detroit, MI

The George W. Kuhn Drain Improvements Project conducted in Oakland County, Michigan, is an expansion of the existing retention basin, designed to increase drainage to 124 million gallons of storm water runoff.
Torpharm Expansion II, Toronto, ON, Canada

Torpharm Expansion II, Toronto, ON, Canada

The Torpharm Expansion project was scheduled for completion 11 months after starting.