A consortium of Alstom and Amec Industrial have been commissioned to install a Sea Water FGD plant as part of a major capital improvement programme by Scottish Power that will secure the future of Longannet Power Station – the second largest ...
Harry Rosen Expansion Project, Toronto, Ontario
PERI designed, supplied and installed MULTIPROPs and GT 24 girders in combination with PERI UP scaffolding components to provide a safe pedestrian walkway for the 2 story expansion of the well known prestigious Harry Rosen Clothiers in Toronto.
European Patent Office, Munich, Germany
Located in the Munich city centre, the European Patent Office was extended through the addition of two building complexes. The two buildings were constructed in an offset position to each other over a length of nearly 200 m and featured modern ...
Bioethanol Production Plant AEP 2008, Norrköping, Sweden
With a formwork solution matched to conform to all requirements, the construction progress could be positively influenced. As a result, up to 1,000 m³ of concrete could be processed every week and efficiently formed.
Albertinum Central Depository, Dresden, Germany
For the various assembly phases, a 16.50 metre high working and support level could be erected using the PERI UP modular scaffold system which means all task assignments can be carried out very cost-effectively.