The dam in the French Pyrenees is 320 m long and 22 m high. Thus, up to 6 million cubic metres of water from the River Nivelle can be retained on an area of 73 hectares which also contributes to the flood protection measures.
Bridge over the River Oka, Murom, Russia
The cable-stayed bridge features two 231-metre spans and is carried by three pylons with heights of around 90 metres. Cross-sectional forms and dimensions of the pylon legs constantly change over the total height. The PERI climbing formwork ...
Exhibition Centre Hotel Rho-Pero, Milan, Italy
The new exhibition centre hotel with its two inclined towers dominates the extensive Milan trade fair facilities. In order to be able to efficiently finish the concrete shell in the specified, short construction period of only twelve months ...
Rusca Dam, Teregova, Romania
The Rusca Dam in the Banater Mountains has an overall height of 75 m and the river Raul Alb river forms a reservoir at this point which contains a seasonal-related volume of up to an impressive 35 million m³ of water when full.
Muldenberg Dam, Vogtland, Plauen, Germany
The foundation beam at the base of the dam could be formed and concreted with horizontally-positioned TRIO wall formwork elements. Single-face forming of the concrete shell was carried out with VARIO customized elements on SKSF 240 climbing brackets.