PERI Systems In Use

MULTIFLEX Girder Slab Formwork

Mixed Use Development, Dubai, United Arab Emirates

The building complex with 58 and 55 floors respectively, stands out through its slim structural shape and features a multiple-folded glass facade as an architectural highlight.

Barwa Commercial Avenue, Doha, Qatar

The new showpiece business centre runs alongside the motorway and is a very impressive 8 km long.

Ledvice Power Plant, Czech Republic

The new 660 MW block is an important component of the extensive modernization measures for the Ledvice lignite-fired coal power plant. For construction of the massive structural elements in connection with the transfer of loads at great heights, ...

Albian Sands, Fort McMurray, Canada

With PERI UP Rosett and MULTIFLEX, the high loads from the massive structural elements at heights of between 10 m and 12 m were reliably transferred into the ground.

Antey III, Jekaterinburg, Russia

The industrial and university town of Jekaterinburg now features the highest Russian building outside of Moscow, the 188 m high office tower Antey III. 50 multi-functional floors offer an outstanding infrastructure along with a wonderful panorama.