PERI Systems In Use

TRIO

Stone Creek Bridge, Prince George, British Columbia

For concrete forming of the 22.75 m wide and 73.00 m long bridge deck, Jacob Brothers is using a formwork consisting of GT 24 formwork girders, SRU steel walers and SLS heavyduty spindles.

Justice Mill Lane, Aberdeen

The Justice Mill Lane Project is a £ 75 million mixed use development split between a commercial office development and a 180+ bedroom Park Inn Hotel, for the Rezidor hotel group.

The Angel Building, London

The Angel Building, designed by architects AHMM, will provide 258,412 ft² of Grade A office space strategically located on one of London’s historic focal points where City Road and sophisticated St John Street meet Pentonville Road and bustling ...

Resorts World Sentosa, Singapore

Built at a cost of S$6.59 billion, some of the attractions and facilities the resort will have include Southeast Asia’s first and only Universal Studios theme park, six hotels with different themes and the world’s largest oceanarium.

Wankdorfkreisel Bern, Switzerland

In the city of Bern, a roundabout is currently being re-positioned almost 10 m under the ground which will transform a somewhat dismal road intersection into an attractive gateway to the country´s capital. PERI provided a comprehensive formwork ...