PERI Systems In Use

PERI UP Rosett

Burlington Canal Lift Bridge, Canada

The historical steel bridge across the Burlington Canal had to be vastly refurbished and treated with anti-corrosives. The PERI solution with a suspended scaffold on the basis of the PERI UP Rosett modular scaffold made also use of rentable ...

Ledvice Power Plant, Czech Republic

The new 660 MW block is an important component of the extensive modernization measures for the Ledvice lignite-fired coal power plant. For construction of the massive structural elements in connection with the transfer of loads at great heights, ...

Albian Sands, Fort McMurray, Canada

With PERI UP Rosett and MULTIFLEX, the high loads from the massive structural elements at heights of between 10 m and 12 m were reliably transferred into the ground.

Stetten Environmental Tunnel, Vienna, Austria

The 3.2 km long Stetten environmental tunnel is part of the new S1 expressway located in the northern district of Vienna.

Palm Paper Newsprint Paper Plant, King’s Lynn, Great Britain

Europe´s largest and most modern paper factory is located 150 km north-east of London. From 100% recycled paper fibre, it produces 20,000 m² of newsprint per minute which corresponds to a capacity of 400,000 t per year.