PERI Systems In Use

SRS Steel Circular Column

The Lübeckertordamm office complex consists of two boomerang-shaped structural wings. Stuttgart-based contractors, Müller-Altvatter, developed a comprehensive formwork concept together with the formwork and scaffolding specialists, PERI. (Photo: PERI GmbH)

Business Complex, Lübeckertordamm, Hamburg, Germany

For the office complex, consisting of two boomerang-shaped structural wings, Stuttgart-based contractors, Müller-Altvatter, developed a comprehensive formwork concept together with PERI.
Completion of the first construction phase is planned for the end of 2005. Over 6,000 m² PERI SKYDECK slab formwork with 8,000 MULTIPROP post shores considerably accelerated building progress. (Photo: PERI GmbH)

MobileLifeCampus, Wolfsburg, Germany

With the construction of the Auto University at Hageberg in Wolfsburg, Volkswagen AG will have its own centre of expertise with the central campus consisting of three faculties – Humanities, Economics and Technology
RONDO 1 Building Complex, Warsaw, Poland

RONDO 1 Building Complex, Warsaw, Poland

The RONDO 1 construction project in Warsaw is representative for the ambitious course of development which Poland is currently following in order to become a successful member of the European Union.
Pollock Halls of Residence, University of Edinburgh

Pollock Halls of Residence, University of Edinburgh, United Kingdom

Edinburgh University has invested £21m on upgraded student accommodation at its Pollock Halls of Residence on the edge of Holyrood Park.
Kuhn Drain GWK Drainage Project, Detroit, MI

Kuhn Drain GWK Drainage Project, Detroit, MI

The George W. Kuhn Drain Improvements Project conducted in Oakland County, Michigan, is an expansion of the existing retention basin, designed to increase drainage to 124 million gallons of storm water runoff.
 Page:  2