Waste Water Treatment Plant built with PERI GRV Circular Wall Form System in Boston, MA
The Boston Harbor Project is an ongoing, multibillion dollar waste water treatment facility, which when completed will service all of eastern Massachusetts.��
Danube Bridge BAB A8 near Leipheim, Germany
A 375 m long bridge had to be constructed over the river Danube for the route to Munich.
Northern Embassies, Berlin, Germany
Designed as a representation of the five northern countries of Denmark, Finland, Iceland, Norway and Sweden, an ensemble of buildings.
Water Reservoir, Aprilia, Italy
During the construction of this drinking water container of 3,000 m³ capacity, the use of the PERI systems allowed optimum adjustment to the geometry of the building construction.
To use wind power is seen as an ecologically sensible way of extracting energy. An off-shore plant was constructed for this purpose in the sea, two kilometres away from Copenhagen harbour.