PERI Systems In Use

HD 200 Heavy Duty Prop

PERI Project: The Temple, Warsaw, Poland

The Temple, Warsaw, Poland

In the south of Warsaw on an area of about 6 hectares, an impressive temple is being developed. For the successful completion of such a complex structure, the site can rely on a comprehensive formwork and scaffolding solution provided by PERI. ...

55 West Church Street, Orlando, Florida

Construction of the 55 West on the Esplanade in downtown Orlando began in
mid-2005. The project is a 35 story mixed use commercial / residential tower adjacent to a 12 story parking garage.

Toulouse-Blagnac Airport, France

The project is being developed by a consortium which is comprised of three French construction companies, with formwork know-how and efficient system equipment being supplied by the formwork and scaffolding specialist, PERI.

Tošanovice-Žukov Bridge, Ostrava, Czech Republic

This included a 720 m long steel composite bridge, one of the longest in the country. For this, PERI supplied two rentable composite formwork carriages made with components taken from the new VARIOKIT construction set.

Reinertshof Tunnel, Füssen, Germany

The 645 m long tunnel with a double-tube rectangular cross-section was constructed using a cut-and-cover method.
 Page:  2