PERI Project: Belchatow Power Plant, Poland (Photo 1)

Belchatow Power Plant, Poland

The Belchatow facility is the largest lignite-fired power station in Europe. For the new development of the 830 MW block PERI is supplying a falsework combination consisting of ST 100 stacking towers and the flexible MULTIPROP system.

The Troika, Kuala Lumpur, Malaysia

Three new apartment towers with 50, 44 and 38 floors respectively, and an impressive glass and steel facade, dominate the Kuala Lumpur city centre. The building complex is in close proximity to the 452 m high Petronas Towers and bears the hallmark ...
Capella Hotel Sentosa Island, Singapore

Capella Hotel Sentosa Island, Singapore

Due to the short construction period, general contractors, Tiong Seng, decided to take a new direction in the form of innovative formwork systems from PERI.
In the eastern part of the city centre, the well-known Siekierkowska route heads towards the southern ring road using two new bridge constructions with three levels and no intersections. For constructing the piers and retaining walls, as well as the bridge superstructure, PERI Warsaw provided the most cost-effective solution.

Siekierkowska Road Junction, Warsaw, Poland

To ensure fast building progress, six casting segments around 50 m long in each case were to be formed at the same time. For forming the box-type cross-sections of the reinforced concrete bridges, PERI engineers designed raised formwork units ...
Kops II pumped-storage hydro-power station, Partenen/Montafon, Austria

Kops II pumped-storage hydro-power station, Partenen/Montafon, Austria

The Weissenhorn-based formwork and scaffolding specialist, PERI, provided a comprehensive concept for cost-effective erection of the massive reinforced concrete walls and slabs required for this very unusual construction site.