Built at a cost of S$6.59 billion, some of the attractions and facilities the resort will have include Southeast Asia’s first and only Universal Studios theme park, six hotels with different themes and the world’s largest oceanarium.
Situated on Lake Shore Boulevard West in Toronto, Beyond the Sea condominium project is comprised of 3 towers between 27 to 45 storeys high. During June 2009, Resform Construction Limited, the concrete formwork contractor of the project commissioned ...
4.20 m high VARIO GT 24 was used for the core and retaining walls, single sided in combination with SB-B brace frames. 21 sets LICO column formwork helped to pour 60 cm x 60 cm up to 130 cm x 130 cm columns.
At the Al Muneera project in Abu Dhabi, Al Futtaim Carillion chose to use the VARIO GT 24 system for walls and columns as it could be used in all areas, being a versatile system with a built in safety.