Housing

Oxtalls Campus, University of Gloucester Main contractor, HBG Construction appointed Thames Valley Construction to erect the three storeyhigh concrete frame within a 14 week programme. PERI’s TRIO wall panel formwork, MULTIPROP tables, FB 180 platforms and VARIO girder column formwork ...
Residential Building in Neuperlach, Munich, Germany For forming the almost 3 m high walls, the TRIO 270 elements were simply extended with narrow, primarily 30 cm wide panels positioned horizontally.
Cité Saint-Vincent de Paul Residential Complex, Beziers, France Altogether 11,000 m² reinforced concrete slabs were to be constructed with a thickness of 20 cm whilst actual floor heights
reached 2.57 m.
“M-Street” 8th & Madison, Seattle, Washington SAK used SKYDECK, the modular aluminum panel slab system for the deck of this building in order to meet a 10 day floor cycle.
Safari Drive Condominiums, Scottsdale, Arizona Concrete Structures worked with PERI to shore a large 70,000 ft² (6,500 m²) main level deck that will later support the steel structure of the numerous overlying residential and commercial buildings.