The unique architecture of the Airrail Center, and the fact that the roof of existing building forms the basis for nine new storeys, requires a complex formwork and scaffolding solution. In particular, for the transfer of loads during construction ...
The Denver Justice Center consists of two distinct structures: The Detention Facility and the Court House Building. Both buildings broke ground in August 2007 and the concrete work is scheduled to complete by November 2008.
Ashton South End in Charlotte, NC is one of the first projects in the USA to use PERI’s new RCS Formwork Lift (RCS L). Wayne Brothers’ tight schedule to complete this eleven story condominium project with 45,000 ft² (4,181 m²) typical floors ...
Expanded Structures Ltd used CB 240 jump forms with trailing platforms on all four cores and chose to have them pre-assembled at the PERI fabrication facility in Rugby.