The 515 m long cable-stayed bridge connects the Bretonic mainland in the northwest of France with the Crozon peninsula. The main span is 285 m and the the two pylons each reach a height of around 100 m.
Led by Bilfinger Berger Inc., the Canadian arm of the Bilfinger Civil group and CH2M Hill International (Project Management), this joint venture is providing design and construction services for the Golden Ears Bridge project. Started in the ...
The cable-stayed bridge features two 231-metre spans and is carried by three pylons with heights of around 90 metres. Cross-sectional forms and dimensions of the pylon legs constantly change over the total height. The PERI climbing formwork ...
The 1,455 metre long Saadiyat Bridge in Abu Dhabihas has an impressive width of 60 metres – one of the widest bridges in the world. The main bridge has a span of 200 metres with an overhead clearance of 26 metres in the bridge centre and is ...
The construction of this 590 m long cable-stayed bridge is characterized by two 100 m high, A-shaped pylons – construction execution with high levels of safety and cost-effectiveness provided by PERI know-how and system equipment. ACS self-climbing ...