Industrial Structures

LNG Terminal Fos-Cavou, Marseille, France With VARIO GT 24 and CB climbing formwork units, the 28 m high and 80 cm thick external walls could be cost-effectively climbed in 4 m cycles.
Kops II pumped-storage hydro-power station, Partenen/Montafon, Austria The Weissenhorn-based formwork and scaffolding specialist, PERI, provided a comprehensive concept for cost-effective erection of the massive reinforced concrete walls and slabs required for this very unusual construction site.
LNG liquid gas tanks, Cameron, USA In the US state of Louisiana, three enormous liquid gas tanks are currently being built at the same time   using a PERI climbing formwork solution.
Montmorency Subway Station, Laval, Quebec PERI offered the TRIO wall formwork system - with SB Frames for the bottom one-sided walls
Concrete casing for liquid gas tank, Aumale, France Construction work on a new facility for the French gas company, Butagaz, is being carried out close to the town of Aumale in the northwest of France.