Two movable weather protection roofs span two incremental launching facilities for the construction of a bridge superstructure near Grudziądz in Poland. This construction provides protected working areas and guarantees continuous operations ...
The new Meydan Race Course is part of Meydan City in Dubai. It is able to hold 60,000 spectators and hosted the Dubai World Cup for the first time in March 2010.
The historical steel bridge across the Burlington Canal had to be vastly refurbished and treated with anti-corrosives. The PERI solution with a suspended scaffold on the basis of the PERI UP Rosett modular scaffold made also use of rentable ...
For about 1 km, the motorway D1 runs on pillars on a dam structure in the flood plain. A total of eight VARIOKIT formwork carriages ensured fast shuttering and moving periods during the production of the steel composite bridge.
With a height of about 20 metres, a PERI UP Rosett Flex scaffold offers working area and access to all building components of a nearly 70 years old reinforced concrete arched bridge in the North of Portugal, that require refurbishment. The ...