Versatility, safety and fast forming for walls, columns and slabs
At the Al Muneera project in Abu Dhabi, Al Futtaim Carillion chose to use the VARIO GT 24 system for walls and columns as it could be used in all areas, being a versatile system with a built in safety.
It can easily accommodate changes in profile and height. Table forms were used for the slabs in most of the area. Especially with the swivelhead fitted to the table modules, the tables can easily be taken from floor to floor by using the crane with a PERI table hook. With this solution, a typical floor cycle of seven days could be achieved.
Our top priority of safety in use coupled with the requirement for flexibility, efficiency and highly competent technical back up has led to the successful use of PERI formwork.