The PERI solution functioned in equal measure as shoring and as an assembly platform, and allowed site personnel to work very efficiently. Consequently, the pairs of trusses – which were delivered to the site in segments and then pre-fabricated ...
For constructing the intermediate slabs for the service areas, using SKYDECK on MULTIPROP MP 120 props meant that continuous forming could take place for the low, in part only 1.45 m floor-to-ceiling heights.
The production of this 155 m long and 73 m wide multi-functional building, complete with a grandstand that caters for up to 4,000 spectators, placed high requirements on the construction progress itself as well as the formwork materials used. ...