Absolute Condos is a five-tower luxury condominium complex in the heart ofMississauga. Currently under construction by Ontario builders Fernbrook
Homes in collaboration with Toronto developer Cityzen Development Group, Phase 4 of this ...
The MaxHaus Morumbi in São Paulo consists of four residential towers each with eight storeys. In addition to PERI climbing formwork with VARIO and CB, GRIDFLEX aluminium grid slab formwork is being used for the first time in Brazil.
The cellar of the Rettenberg single-family house was realised on an incline with 25 cm thick reinforced concrete walls and formed in two concreing cycles.
20 % time-savings – the new MAXIMO panel formwork shortened the construction time for the cellar walls by almost one day. The conical MAXIMO tie is fitted from one side only which means having one man on the external wall is no longer necessary. ...
Main contractor, HBG Construction appointed Thames Valley Construction to erect the three storeyhigh concrete frame within a 14 week programme. PERI’s TRIO wall panel formwork, MULTIPROP tables, FB 180 platforms and VARIO girder column formwork ...