PERI GmbH - Water Retaining Structures

Water Retaining Structures

Czajka sewage plant, Warsaw, Poland Together with the Warbud construction company, PERI´s Polish engineers developed a cost-effective and comprehensive concept which fulfilled all requirements regarding the best-possible concrete surfaces, short construction period and a high ...
Clench Warton STW, Kings Lynn, Norfolk Sub contractor, Bell Formwork Services Ltd were offered a £1.5 million contract to build the two 20m diameter concrete tanks. Working in cooperation with PERI, they decided to pour the 20m high tank walls in four pours using 5m high curved ...
Budds Farm WTW, Havant PERI‘s core product, the TRIO wall formwork panel system is currently being used to construct a new 9 m high aeration tank for the extension of an existing wastewater treatment facility at Budds Farm in Havant, Hampshire.
Sandelermöns Waterworks, Jever, Germany The PERI RUNDFLEX Plus circular formwork, together with TRIO panel formwork and PERI UP reinforcement scaffolding units, provided the most cost-effective solution for the construction team.
Rusca Dam, Teregova, Romania The Rusca Dam in the Banater Mountains has an overall height of 75 m and the river Raul Alb river forms a reservoir at this point which contains a seasonal-related volume of up to an impressive 35 million m³ of water when full.
 Page:  1