With a height of about 20 metres, a PERI UP Rosett Flex scaffold offers working area and access to all building components of a nearly 70 years old reinforced concrete arched bridge in the North of Portugal, that require refurbishment. The ...
Czech and German PERI engineers, in close co-operation with the Prague-based building contractor Metrostav, developed a very cost-effective all-in-one solution.
For the construction of the 767-metre long motorway bridge in the area of the "Centrum“ D1 motorway junction, PERI´s Slovakian engineers developed a formwork and scaffolding solution which perfectly suited the on-site requirements.
The Golden Ears Bridge is a 970 m long cable-stayed bridge over the Fraser River. It is the core element of the 13 km six-lane highway project near Vancouver which was completed and opened to traffic in June 2009 - in time for the 2010 Winter ...