Bridges

       1 | 2 | 3 | 4 | 5 | 6      

Lek Bridge, Vianen, Netherlands

Cantilever formwork in the main section of the bridge. Beginning at the piers positioned close to the river banks, the pre-stressed box girder is formed and concreted from both sides with around 80 m cantilever until both halves of the superstructure join over the middle of the river. (Photo: PERI GmbH)