Multi-Storey Buildings

       1 | 2 | 3 | 4 | 5 | 6 | 7      

Marina Bay Sands™, Singapore

With the PERI ACS self-climbing system, the elevator shafts are constructed without the need of a crane. The subsequent floor slabs can be pre-tensioned from the finishing platforms.