Øresund Link between Denmark and Sweden - The bridges

PERI formwork system for the concrete deck superstructure comprises 14 sets of outside carriage formwork, each 20 m long, and two complete sets of inside formwork, each consisting of seven 20 m long carriages. The work platforms and ladders required were also incorporated.