Cultural Buildings

       1 | 2 | 3 | 4 | 5 | 6 | 7      

Muldetal Bridge, Wurzen near Leipzig, Germany

The formwork for the 4.80 m to 5.90 m high foreshore piers could be adapted without any time-consuming assembly work being required which resulted in large time savings. This meant that work on the bridge superstructure could start earlier.