Tunnels

       1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10      

City Tunnel Malmö, Sweden

With the two PERI formwork carriages, the 15 m long casting segments are constructed very efficiently. Hydraulically-operated raise and lowering equipment ensure time and cost-saving moving procedures. The PERI construction can be continuously adapted to the varying cross-sectional dimensions. (Photo: PERI GmbH)