Tunnels

      1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10      

City Tunnel Malmö, Sweden

The variable PERI VARIO GT 24 girder wall formwork can be positioned exactly by means of the formwork carriage. The procedure is carried out by heavy-duty rollers on rails, on the concrete sub-base at the front and on the finished bottom plate at the rear. (Photo: PERI GmbH)